Clayton Holdings

35,000 sf
Denver, CO 

This two floor renovation at 1700 Lincoln in Downtown Denver features many work place amenities including a new structural interconnecting stair between floors to allow easy access for employees.

“Jim; I wanted to reach out to you and thank you and your team for a wonderful job that they did with our space at 1700 Lincoln.  The space is spectacular and our employees are loving it.  Your PM did a fantastic job of keeping this on track and meeting all the deadlines as well as keeping us as close to budget as possible.  Your Superintendent did a great job of managing everything on site and your Estimator did a great job costing it all out.  It was a pleasure working with your team.  Please use me as a reference in the future.  I hope we get to work together again soon.”

Colleen D. Teears CFM, CBCP
Vice President, Director of Administration
RADIAN (owner of Clayton Holdings)

Morgan Stanley

37,384 sf
Greenwood Village, CO

This tenant takes space on the top two floors of One DTC, a premier Denver Tech Center address. This multi-million renovation involved developing a new interior stair case and adding modern wood features throughout.

"BOOTS Construction's accurate budget pricing protects the Landlord and puts the best possible deal in front of the tenant in order to get them signed up in our buildings. BOOTS is the number one interface between a new tenant and our management team and BOOTS always provides a product that is under their original budget, on time and with very minimal punchlist items. I always feel like I'm leaving the tenant in good hands with BOOTS."

Joe Serieno
Senior Vice President, Brokerage Services
CBRE

ISC Corp

20,900 sf
Englewood, CO

A high-tech corporate office build-out, the work on this project was really customized to the clients’ needs. Included among the specialized items, the incorporation of DDC controls and building in an 1,800-gallon fish tank in the CEO’s office stand out.

"We couldn’t have selected a better company than BOOTS Construction to partner with. Our new office and technology facility started with a tilt-wall shell and had to be completed within a strict ninety-day window. The extent of the technology infrastructure and the demands placed on BOOTS and the Subcontractors were non-trivial. Throughout the entire process, BOOTS had a stellar management team that worked incredibly well and open with us. In turn, they managed the project and the Subcontractors to an on-time, on-budget and on-spec completion. Our experience with BOOTS Construction was fantastic!"

John Palley
Vice President
ISC Corp