Palazzo Verdi Lobby

Greenwood Village, CO

An impressive lobby renovation at the Palazzo Verdi building for Schnitzer West showcases a variety of high-end design elements. The renovation features a new moss wall and large tree centerpiece, bringing a natural, organic aesthetic to the space. Updated Italian tile flooring extends throughout. Custom millwork was used to introduce new planters, a sleek bar, and integrated bench seating, all with a modern, tailored finish. To create a division between the lobby and adjacent restaurant, a custom slated wood demising wall was installed, offering both separation and a sense of openness.

 

 

Denver Place Lobby

Denver, CO

This lobby renovation project was completed for LBA Realty at Denver Place. The modernized lobby features a moss wall, specialty wood ceilings, custom millwork, and a variety of flexible seating options.

“Excellence in Action! Once again Boots has delivered exceptional results on a major building common area renovation. With multiple specialty features, the success of the project relied heavily on their ability to communicate and collaborate with all of our vendors. As always, they delivered and we couldn’t be more excited to welcome people back to a transformed building.”

Jennie Fedrizzi
Senior Project Manager
LBA Realty

 

 

1595 Wynkoop Street Lobby

Denver, CO

This renovation included decommissioning EPA's security by demoing bullet proof glass to create a new building entrance and security desk.

“Working with BOOTS Construction was such a wonderful experience. Not only was I treated as a Client but I felt as though I was a part of the BOOTS family. Their attention to detail and professionalism sets them above the rest.”

Jessica Butts
Colliers International
Property Manager, 1595 Wynkoop Street

 

 

One DTC Lobby and Common Areas

Greenwood Village, CO

One DTC is one of the premier Class A office properties in the Denver Tech Center and the transformation of the lobby is a beautiful masterpiece. Working with a symphony of finish materials in granites, wood and frosted glass, this occupied modernization included adding new electronic directory signage, remodeling staircases, and updating millwork elevator surrounds.

"BOOTS Construction's accurate budget pricing protects the Landlord and puts the best possible deal in front of the tenant in order to get them signed up in our buildings. BOOTS is the number one interface between a new tenant and our management team and BOOTS always provides a product that is under their original budget, on time and with very minimal punchlist items. I always feel like I'm leaving the tenant in good hands with BOOTS."

Joe Serieno
Senior Vice President
Brokerage Services, CBRE

US Bank Tower Lobby

Denver, CO

This lobby remodel in downtown Denver included two new revolvers and updated high-end finishes.

 

 

"The US Bank Tower lobby needed to remain open throughout construction and the Boots team was able to successfully complete a very tricky, phased construction schedule, while ensuring the safety of the building’s tenant and visitors.  They came prepared with solutions to get past any obstacle that arose.  They are a trusted partner that we always look forward to working with"

Bryan Kristof & Laura Swank
Abel Design Group

1290 Broadway Lobby

Denver, CO

This elegant main lobby and elevator remodel was completed in an occupied Class A downtown office tower. The finished work features custom light fixtures, high end millwork and granite flooring and was completed with minimal tenant disruption.

“BOOTS Construction Company was an integral part of 1290 Broadway’s achieving LEED GOLD status. We were presented with a challenge that, if we could do it, would provide us with four points towards our goal of obtaining a LEED Gold designation. We were told these points were all but impossible to get. We turned to BOOTS to help us design and implement a construction project that would generate less than 5% waste going to a land fill. BOOTS delivered us a project on time and on budget with ZERO waste going to a landfill. Many thanks.”

Greg Monks
Chief Operating Engineer SMA, LEED AP
CB Richard Ellis

1875 Lawrence Lobby

Denver, CO

Working within a fully occupied space, work on this multi-million dollar expansion involved shifting the primary lobby from one end of the building to the other. The existing storefront was pushed out 20 feet and extended two stories up with a structural expansion that included adding canopies and signage resulting in an increase in rentable space.

"BOOTS Construction did a fantastic job on our renovation project at 1875 Lawrence in Denver. Their team was very professional, extremely thorough and completed the project within budget. I couldn't have had a better team in place or a better experience."

Mark Flynt
Senior Vice President — Portfolio Manager
Behringer Harvard (Building Owner)

South Tabor Center Lobby Entrance

Denver, CO

We created a new three story lobby entrance for the Tabor Center by demolishing the old ESPN Zone space. We added a new custom staircase, refurbished the escalator, added a new exterior revolving door and added some new unique finishes and features to the space.

"Professionalism, Knowledge, teamwork and timely responsiveness are only a few of the qualities that BOOTS Construction showed during the execution of this recent multi-phased renovation project under tight schedule and budget conditions. Their performance has raised the bar for all General Contractors. We will continue to work with BOOTS Construction as often as possible."

Danette Ferretti
Design Principal
Carrier Johnson + Culture