phone 303-721-5800

Holmes Murphy

11,300 sf
Greenwood Village, CO

Holmes Murphy's new Denver office space located in Greenwood Village, CO features a custom wood wall featuring their logo branded into the wood, polished concrete floors, and specialty wood ceilings.

“The Boots team and all their subcontractors put together our incredible, new Holmes Murphy-Denver office.  Our company aspirations, culture and vibe shine through the space which is so important to us and our customers. Thank you Boots Construction!”

Don Appleby
Surety Director/Shareholder
Holmes Murphy

 

Alteryx

78,000 sf
Broomfield, CO

Computer software company, Alteryx, selected BOOTS to build-out their new Broomfield office. This multi-phase project took 16 weeks to complete. The space features open ceiling work areas and custom wall graphics.

We had our ribbon cutting to rave reviews, lots of smiles, and thank you's. This is a tribute to how well your team organized and managed the build out. I personally have never participated in a project like this. Coming into it, I was warned how difficult and painful it was going to be. Honestly, it has been very easy. Congratulations on having such a great team! We look forward to working with you again!"

Amy Holland
VP Customer Support
Alteryx

Air Methods

64,000 sf
Denver, CO

Air Methods is an industry leader in emergency medical air transportation.  Their new HQ includes specific elements such as a flight simulator room, medical simulator and flight training rooms, a centralized break room with new patio access, and a 3-story atrium connecting the floors along with many other amenities.

“Professionalism, knowledge, teamwork, and timely responsiveness are only a few of the qualities that BOOTS Construction showed during the execution of this recent multi-phased renovation project under a tight schedule and budget conditions. Their performance has raised the bar for all general contractors. We will continue to work with BOOTS Construction as often as possible.”

Danette Ferretti, Design Principal
Carrier Johnson + Culture

CoBiz Financial

52,000 sf
Denver, CO

With BOOTS Construction CoBiz Financial took advantage of early work permits to start their headquarters and 1st floor retail bank build-out well in advance of the base building completion. Located at 1401 Lawrence, telescoping walls, an inner-connecting stair seated on Italian Blue De Savoie stone, multi-dimensional ceilings and island waterfall elements combine for a sophisticated, flexible-use office environment. 

I am pleased to have worked with the BOOTS Construction team on the build-out of our new headquarters in downtown Denver. The BOOTS team was top notch from day one through completion and beyond. Our project was being completed in a new building, which added a high level of logistical challenges. Throughout the entire process, the BOOTS team, carried a “can do” attitude, stayed within budget and on time while maintaining a fantastic professional attitude in how they worked with another construction crew on site. I would highly recommend BOOTS construction for any tenant improvement project and I look forward to working with them again on our next build-out."

Mark Frank
EVP, Senior Operations Executive
CoBiz Financial

Michael Best & Friedrich LLP

14,937 sf
Denver, CO

National firm, Michael Best & Friedrich LLP opened its doors to a new, larger office in Denver at Block162 to keep up with a growing team. Highlights include a Muraflex operable wall with ribbed glass for privacy in the lobby lounge and 180-degree pivot doors covered in hand painted silk from Italy that lead into the conference rooms. All-glass office fronts provide the full space with access to daylight and views of the mountains.

“We are so grateful for the superintendent and project manager and their tireless work to help us create our new home in Denver. Despite incredible challenges in the supply chain and COVID struggles they did an exceptional job keeping us on time and on budget.  They went above and beyond finding value solutions and following up with vendors to bring our new space to life.”

Shawn Stigler, Denver Managing Partner
Michael Best & Friedrich LLP

Dorsey and Whitney LLP

30,000 sf
Denver, CO

This multi-phased remodel is located at 1400 Wewatta in downtown Denver. The tenant had some high-end finishes including Alur Operable Walls, 9wood ceilings, Italian tile, back painted glass, and new graphics throughout.

“As a construction law lawyer, I’ve literally dealt with thousands of contractors and projects. Boots re-set my expectations in a positive way. We did our office re-model during Covid and so many things could have gone sideways – but the people of BOOTS didn’t let that happen. Our project team from BOOTS seemed to be always present, always responsive, and always willing to solve any problem. We could not have picked a better general contractor.”

Robert Hensley, Denver Office Head Partner
Dorsey and Whitney LLP

Senn Visciano Canges P.C.

15,214 sf
Denver, CO

Repeat client Senn Visciano Canges's office modernization included an updated reception with elegant hardwood entry and upgraded conference and huddle rooms with specialty acoustic wall panels.

“BOOTS created a living workspace sooner than expected and below budget. With the Project Manager's conscientious supervision, his efficient and hardworking team dedicated itself to every detail of meticulous construction and perfect finishes. We could not be more pleased.”

Mark Senn
Senn Visciano Canges, P.C.

US Bank Tower Lobby

Denver, CO

This lobby remodel in downtown Denver included two new revolvers and updated high-end finishes.

 

 

"The US Bank Tower lobby needed to remain open throughout construction and the Boots team was able to successfully complete a very tricky, phased construction schedule, while ensuring the safety of the building’s tenant and visitors.  They came prepared with solutions to get past any obstacle that arose.  They are a trusted partner that we always look forward to working with"

Bryan Kristof & Laura Swank
Abel Design Group

Vera Whole Health

5,345 sf
Thornton, CO

Vera Whole Health’s new primary care facility located in Thornton, CO is equipped with multiple exam rooms, a training room, breakroom, and reception area.

"During one of the most challenging years I have seen in decades; Boots Construction was able to deliver our project on time and on schedule! I can’t say enough about the ease of doing business with this team even though supply chain and labor issues are the new normal.  The project manager and superintendent found creative solutions to work around these challenges and deliver a beautiful space. I trusted them to be my eyes and ears on site and were there for me whenever I had a request. I really appreciated how they flushed out any scheduling issues well ahead of time and came with solutions to any problems. I would highly recommend this team for any future business in Denver and wish they could travel with me to all of my builds across the country!”

Karen Kellner
Senior Project Manager, Humana Workplace Solutions

Colorado Christian Academy

76,436 sf
Englewood, CO

Colorado Christian Academy’s impressive new school in Englewood, CO encompasses classrooms ranging from pre-K through elementary levels, a cafeteria, a large auditorium, art and science rooms, a chapel, as well as an indoor slide to take you from the second floor to the first floor.  BOOTS also removed a parking lot to make room for and build the school’s new playground and field. This upgraded school will provide an optimal learning environment for both current and future generations of students.

“The entire BOOTS team on the Colorado Christian Academy project has been simply amazing. Not only did they have a tight timeline to get a large, high-finish project done, they worked constantly with optimism and exceptional work ethic. When things went wrong, your team found solutions quickly or presented thoughtful options to us. I appreciate them all so much and this project and TCO for 160 students, 75 families, and 22 staff members that was achieved, certainly would not have been possible without the miracle they pulled off.”

Natasha Harris
Biegert Group