Metro Point Lobby

Denver, CO

This intense lobby remodel was highlighted by the installation of a custom ceiling-mounted LED chandelier. A five-story scaffolding system was erected inside the atrium to individually install dozens of cables ranging from 8 to 50 feet in length. Other features included a concealed grid ceiling and Arktura custom scrim panels.

“Hiring the right contractor and team was the #1 priority for the Metropoint Atrium renovation due to the unique design and difficult access requirements. Your Project Manager and Superintendent went the extra mile ensuring a safe worksite, solving constructability challenges, and fine tuning the finished product. This project is a one of a kind in Colorado and they organized and executed one of the finest installations of a highly complex design I have seen”

 Dave Fritzler
Senior Project Manager
CB Richard Ellis