Triangle Petroleum

19,100 sf
Denver, CO

This full-floor project on the 25th floor of the Tabor Center in downtown Denver was constructed on a fast-track schedule with multiple changes throughout. High-end finishes were the norm in this space, which included a water feature in the main lobby, NanaWall for the conference room, DIRTT wall fronts for offices and many detailed millwork features.

BOOTS Construction is one of the most proactive and collaborative General Contractors in Denver. When working with them, design and construction become one seamless process. We always look forward to teaming with them and we’re glad to have recommended them for Triangle Petroleum”

Rick Burkett, AIA, LEED AP
Principal
Burkett Design